Worker injured falling down a service riser shaft

Newcastle upon Tyne Magistrates’ Court heard how Meldrum Construction Services Limited (MCS) was the principal contractor for refurbishment work at premises in Percy Street, Newcastle Upon Tyne.

MCS failed to plan for the requirement for temporary platforms to be installed in the service riser to provide a safe work area. Subsequently, temporary floors were installed to specifications they had not been designed for. A worker stepped onto the temporary wooden floor on the first floor riser which collapsed and he fell 4.5 metres to the floor below, spraining both ankles.

An investigation by the Health and Safety Executive (HSE) into the incident found that MCS failed to plan and manage the construction phase of the project in that they failed to plan and manage the temporary works within the service riser.

Meldrum Construction Services Limited of Panteon Building, Lancaster Road, Dunston, Gateshead, pleaded guilty to breaching Regulations 13(1) of the Construction (Design and Management) Regulations 2015, and was fined £120,000 and ordered to pay costs of £1969.

Added: 26-07-2016
Back

Breaking News

Head Office:
First Floor Offices, 11-23 Market St.
Gainsborough, Lincolnshire
DN21 2BL

Tel: 01427 678660
 

HR and Accounts:
26/26a Hickman Street
Gainsborough, Lincolnshire
DN21 2DZ

Tel: 01427 678660
 

Hull Office:
West 1, West Dock Street
Hull HU3 4HH

Tel: 01482 534 348
 

Manchester Office:
Hyde Park House, Cartwright Street
Newton, Hyde, Cheshire SK14 4EH

Tel: 0161 367 1214
 

Birmingham Office:
2450 Regents Court The Crescent
Birmingham Business Park Solihull B37 7YE

Tel: 0121 69 59 290
 

London Office:
4th Floor, 86-90 Paul Street
London EC2A 4NE

Tel: 0207 111 0958